Back to blog
Storage 4 min read
750 MW Battery Auction: Guide to Storage in Portugal
The announced storage-auction model and the importance of environmental and territorial feasibility.
The National Energy Storage Strategy placed battery systems at the centre of Portuguese energy policy. The announced auction provides for 750 MW of storage capacity.
A grid connection is not enough
Preparing an application also requires assessing environmental and territorial compatibility. Location, constraints and the legal framework may determine whether a BESS project is viable.