Back to projects
Hydrogen Centre
RJAIA Screening Request (Case-by-Case Analysis) — Green Hydrogen Production Unit
Preparation of an RJAIA screening request for a green hydrogen production unit with a 10 MW electrolyser in central Portugal.
StartSimple prepared a Screening Request under the Environmental Impact Assessment Legal Regime (PERJAIA) for a Green Hydrogen production unit located in central Portugal, featuring a 10 MW electrolyser with injection into the Natural Gas network. The document assessed the project's potential to cause significant environmental impacts, according to the criteria of Annex III of the Environmental Impact Assessment Legal Regime, with submission made through the SILiAmb platform following a Case-by-Case Analysis result.
Project highlights
- 10 MW electrolyser capacity
- Injection of the hydrogen produced into the natural gas network
- Submission through the SILiAmb platform
Got a renewable project on your desk?
Tell us what stage you are at and what environmental support your project needs.